Solar Batteries Start Lifespan Optimization With Infinitum Desulfators

Solar Batteries Start Lifespan Optimization With Infinitum Desulfators

A customer from the Philippines sent us images of his desulfator installation to optimize the performance and lifespan of his solar battery bank made up of 40 12V sealed lead-acid batteries. He purchased ten 12V Infinitum Desulfators to achieve this purpose. In this 48V solar battery bank system, there are 4 rows of 10 12V batteries connected in parallel. Each row of 10 batteries is maintained and optimized by a couple of 12V Infinitum Desulfators. For the best results, however, we recommend using one desulfator for each 12V battery or a cost-effective alternative where one desulfator is shared among one or three batteries on a rotation basis of 2 weeks or 1 month.

Seen here are four 12V Infinitum Desulfators installed with one for each row of 10 12V batteries in parallel. For the best results, we recommend using one desulfator for each 12V battery or a cost-effective alternative where one desulfator is shared among one or three batteries on a rotation basis of 2 weeks or 1 month.

Share this post

Share on facebook
Share on twitter
Share on linkedin
Share on pinterest
Share on print
Share on email
Share on whatsapp
Share on delicious